Facility condition assessment FCA
[edit] Introduction
A facility condition assessment (FCA) is a complete review of physical building assets based on age, construction techniques, design and materials and so on. In the past, a facility condition assessment was referred to as facilities management audit (FMA or facility management inventory), but this term has subsequently become associated with assets within the building and not the building itself.
[edit] FCA and FMA
There are some areas of overlap between an FCA and an FMA. For instance, methods of gathering data in both instances involve thorough walkthroughs. In addition, FCAs can include interviews and surveys with people who use the building.
Once the information is gathered, the next step is to categorise condition assessment estimates based on established guidelines, such as those presented in the MasterFormat from the Construction Specifications Institute or the ASTM Uniformat II classification system.
The FCA should be acted upon promptly, especially if repairs are urgently required. Like other facility management inventory tools, FCAs require regular updates that reflect changing conditions within the organisation.
[edit] Related articles on Designing Buildings Wiki
- Asset management.
- Benchmarking as business tool.
- Construction Specifications Institute CSI.
- Experience Exchange Report EER.
- Facility condition index FCI.
- Facilities management.
- Facilities management audit FMA.
- MasterFormat.
- Maximising maintenance budgets after lockdown.
- Operational costs.
- Property management.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.